Skip to the navigation.
Skip to the content.
PH₃
- Plant specifications:
- Two treatment chambers, heatable
- Integrated “zoning” (separation of clean and unclean areas, heatable)
- Volume: approx. 280m³ per chamber
- Treatment time: 96 hours
- TÜV certified
- The PH₃ procedure:
- The raw materials to be treated are tempered and exposed to the active agent hydrogen phosphide for four days.
- Throughout its duration the entire process is electronically monitored.
- An elimination of warehouse pests in all stages of their lifecycle, including eggs, is herewith guaranteed.